We implemented an emergency power supply system consisting of three 2910 kVA generators powered by Japanese MITSUBISHI engines, each for one of the largest national data center operators, as part of the additional equipment of the existing data center campus.

 

 

 

Three backup power generators were brought into the premises, and the following systems were also included in the scope of the task:

– cooling system elevated to the roof of the building;

– power take-off;

– engine block heating;

– exhaust system muffling and ventilation of the generator room;

– fuel;

 

As part of the delivery, the room (aggregation house) was also soundproofed by lining the interior of the room with soundproofing material, dismantling the existing genset, as well as securing the power supply until the new units are installed with mobile power generators from the HORUS-ENERGIA rental fleet.